|
CMC Bi-Weekly Trail Maintenance News 03/22/06 Maintenance News....
Look at the latest Closed maintenance items. This list is maintained by Don Walton. CMC now has a maintenance reporting system, which is being tweacked and managed by Don Walton. Not all trail crews are using it yet but we'll get there. It sure makes my life as the eNews editor a little simpler. Danny danny@hikertohiker.org Looking Back.... WorkDate: 03/06/06 PeopleBarth Brooker, Bob Poe, Bruce Greenawalt, Warren Gearrick SummaryWe removed 4 trees and several stumps infringing on trail. Also did a limited amount of lopping. ---------------------------------------------------------- WorkDate: 03/08 PeopleDavid Bair, Don Christensen, David Roberts,Pete Sivcik, John Soldati, John Whitehouse SummarySaw-sweep from blue blaze trail down to Street Gap. Removed more than 14 trees. Trail Work: Installed 7 silt bars (steps); installed 4 large waterbars; installed 28 feet of cribbing, covering heavy root system on trail. ----------------------------------------------------------- WorkDate: 3/10/2006 People Piet Bodenhorst, Jack Thomas, Lew Blodgett, Skip Shelton SummaryRemoved trees, cleared waterbars, lopped ------------------------------------------------------ WorkDate: 3/10/2006 PeopleHowar, McDonald, John Robinson, Jim Bloom SummaryRemoved trees, cleared waterbars, lopping ---------------------------------------------------- WorkDate: 03/10/2006 PeopleJerry Kuhlmann - Jim Hilton - Harvey Fitchelberg - Jim Crouse - Dale Vogel - Bill Newton - Larry Schwake - Ralph Turnberg - Jack Mazurowski - SummaryWe cleaned water bars, cleaned and improved the camp site, removed several blow downs, installed one water bar and one step. --------------------------------------------------------- WorkDate: 03/13/2006 PeopleBarth Brooker,Warren Gearrick,Bruce Greenawalt, Jorge Munoz,Bob Poe, SummaryWe removed about 5 trees and stumps infringing on the trail. We did lopping of trees and some roots. Removed a stump from the trail and did limited tread work. ----------------------------------------------------------------- WorkDate: 3/14/2006 PeoplePiet Bodenhrst, Dwayne Stutzman SummaryFlagged the next mile south of Woodfin/ Cascade trail ----------------------------------------------------------------- WorkDate: 03/15 PeopleDon Christensen, Peter Sivcik, John Soldati, John Whitehouse SummaryInstalled 14 silt bars; installed 4 large waterbars ------------------------------------------------------------------ WorkDate: 03/17 PeopleJim Crouse, Bud Haas, Jim Hilton, Jerry Kuhlmann, Jack Lubbie, Ken Marks, Jack Mazurowski, Robert Rehrer, Larry Schwake, Ralph Turnberg, John Van Valen, Don Walton SummaryWe started out with two teams each going one way on the Laurel Creek Trail. The 6 man team with John went to correct a uprooted tree dugout and steps then planned to go on and clear trees to meet the other team coming from the other direction. John changed that plan by getting sick and us calling 911 to have him transportaed to Pardee Hospital by EMS. We ended up having a good day with John getting released at about 12:30. We need to go back to finish clearing downed trees and construct permanent steps at the dugout site. ------------------------------------------------------------------------------- WorkDate: 3/16/06 PeopleLew Blodgett, Piet Bodenhorst, Alan Frank, Bruce Greenawalt, Jack Fitzgerald, Howard McDonald, Skip Sheldon SummaryCut new trail, Pulled roots. build access trail, Measured and designed a bridge over Cascades stream ------------------------------------------------------------------------------- WorkDate: 3/17/06 PeopleBob Adams,Piet BodenhorstBoyde Brasington,Barth Brooker,Rachel Dowty,Jeff Dector, Janet Dector,Alan Frank,Jessy James,Marilyn Griffith Jennifer Love, Brett Love,David Stubbs, John Whitehouse SummaryAs part of National MST and Trail Day, a great group of 27 volunteers descended on the last piece of the Old Orchard to Woodfin/Cascade Overlook of the MST. This new piece of trail construction finishes another leg of our planned extension of the MST towards Soho Gap. Congratulations to all who gave their efford to this work ------------------------------------------------------------------- WorkDate: 3/18/2006 PeopleLes Love, Don Walton, Larry Modlin, Steve Patch, Ron Walls, Matt Stollenwerk, Sally Jones, Matthew Lindberg, Elliot Fletcher, Warren Gearrick, Sherman Stambaugh, Ken Deal, Carol Deal, Jeff Dektor, Janet Dedtor SummaryConstructed new trail.
|
|