Friday, January 20
This Friday the Friday Pisgah crew of 14 worked 6.5 hours clearing Green River Gameland trails.
We found heavy damage due to the ice storms and winds which followed.
We split the crew into two crews with two saws each,
and cleared many blow downs along Bishop Branch and Pullham Creek, but did not finish our work.
We will return soon to complete this work. Bill
------------------------------------------
CMC EASTERN TRAIL REPORT
Date: 1\20\06
Day of Week: FridayTrail: MSTSECTION ID: Big Ridge- Hard Times Rd.
Item # 537-576-586-587-594-607-610
Travel Work Total
Blodgett, Lew 1 7 8
Bloom, Jim
Bodenhorst, Piet 1 7 8
Brasington, Boyd
Brooker, Barth 1 6 7
Dektor, Jeff 1 7 8
Deal, Ken
Fitzgerald, Jack 2 7 9
Frank, Alan 2 7 9
Freeman, Bill 1 7 8
Hillyer, John
Holladay, Curt
Greenwalt, Bruce 1 6 7
Lazer, Misha
Litvinchyk, Peter
McDonald, Howard 2 7 9
Newton, Bill
Raber, Dan
Robinson, John 1 7 8
Samuels, Sam
Sheldon, Skip 2 7 9
Soldati, John
Stambaugh, Sherm
Thomas, Jack 1 7 8
Walton, Don 1 6 7
WORK DONE: Cleared trail of about 100 trees from last Saturday wind Storm.Cleaned some waterbars and wet crossings. Please close above items Work Needed:.Bent Creek to Chestnut Cove. Northern part narrow, cupping. Four water crossings need rock work. Temporary Rootball bypass need improving
-----------------------------------------------------------------------
Monday Crew Report - 01/25/06
Due to various reasons, the Monday crew was out on Wednesday.
CMC EASTERN TRAIL REPORT
Check: AT _ MTS X Other _
SECTION ID: Rt. 191 to Hard Times Rd.
Rt 74A to BRP 386
Hours
Travel Work Total
Brooker, Barth 1 3 4
Gearrick, Warren 1 5 6
Walton, Don 1 5 6
We finished up the clearing started Friday
on the MST. There were about 10 trees removed
and 6 low hanging rhodos plus lopping along
the trail
Also Don & Warren completed item 613 (trees between
Rt 74A and BRP 386).
Barth
---------------------------------------------
The two CMC Friday crews combined to put 28 workers out today, (Friday January 27).
We worked the Florence tract in Gerton in support of the NC Nature Conservancy with Bonnie Millar.
The picture below is a group shot of our combined crews.
---------------------------------------------------------------------------
CMC EASTERN TRAIL REPORT
Date: 1\27\06
Day of Week: Friday Trail: SECTION ID: Florence Tract Item #
Travel Work Total
Blodgett, Lew 1 7 8
Bloom, Jim
Bodenhorst, Piet 1 7 8
Brasington, Boyd
Brooker, Barth
Dektor, Jeff 1 7 8
Deal, Ken
Fitzgerald, Jack 1 7 8
Frank, Alan 1 7 8
Freeman, Bill 1 7 8
Hillyer, John
Holladay, Curt
Greenwalt, Bruce
Lazer, Misha
Litvinchyk, Peter
McDonald, Howard 1 7 8
Newton, Bill
Raber, Dan
Robinson, John 1 7 8
Samuels, Sam
Sheldon, Skip 1 7 8
Soldati, John
Stambaugh, Sherm
Thomas, Jack 1 7 8
Walton, Don 1 7 8
WORK DONE: Widened Blue trail at the entrance. Build a set of stairs. Marked several re-lo. Cut blow downs.
Work Needed:.Inprove balance of trail, cut trees on Red trail, build re-los on Blue trail. Fix 6 bridges.( Blue and white trail)
Reported by: Piet
CMC EASTERN TRAIL REPORT
Date: 2\3\06
Day of Week: FridayTrail: Green River Cove SECTION ID: Green River Game Lands Item # Travel Work Total
Blodgett, Lew 1 7 8
Bloom, Jim 1 7 8
Bodenhorst, Piet 1 7 8
Brasington, Boyd 1 7 8
Brooker, Barth
Dektor, Jeff 1 7 8
Deal, Ken 1 7 8
Fitzgerald, Jack 1 7 8
Frank, Alan
Freeman, Bill
Hillyer, John
Holladay, Curt
Greenwalt, Bruce 1 7 8
Lazer, Misha
Litvinchyk, Peter
McDonald, Howard 1 7 8
Newton, Bill
Raber, Dan 1 7 8
Robinson, John 1 7 8
Samuels, Sam
Sheldon, Skip 1 7 8
Soldati, John
Stambaugh, Sherm
Thomas, Jack 1 7 8
Walton, Don
WORK DONE: Cleared Green River Cove trail- cut 19 trees, several tree top blockages, build 6 re-lo around root balls, drained 4 wet areas.
Work Needed:.None
Reported by: Piet