Monday Crew work - 01/09/06
Great weather for Monday so it was the day we went out.

Location - AT  - Walnut Mt. Shelter to Bluff Mt.

Work done:
Trip was to scout and perform light maintenance.
Item 447 completed
Leaves collected for Walnut Mt. privy
Lopping done along entire trail & trail to spring at Walnut Mt.
Several small trees removed with hand saw
Small amount of tread work & selected water bars cleaned
Water bar installed on trail from Walnut Mt shelter to spring

Work needed:

See items 608 & 609 (tree removal & blazing)
Additional water bars need clearing
Spring at shelter could use improvement
Trail from Shelter to spring has been redone with heavy equipment used for logging.  We installed
one new water bar but in spring additional work may be required.  At this point in time it is quite
muddy and chopped up.
 
Members participating:

                              Hours
                         Travel    Work   Total
Brooker, Barth       1        7      8
Dektor, Jeff            1        7      8  
Greenawalt, Bruce  1        7      8
Poe, Bob                1        7      8
Walton, Don           1        7      8

Barth Brooker barthb@bellsouth.net 828-299-0298

----------------------------------------------------

Friday January 13
Today we went into the Green River Gamelands to clear the Laurel Branch trail. A crew of 15 split into two crews with two chain saws on each crew. We worked nearly nonstop cutting downed trees and limbs, and did not finish this short trail. As bad weather was predicted, we ended our day about 12:30 for some 4 hours work today. Bill Newton

---------------------------------

CMC EASTERN TRAIL REPORT
Date: 1\13\06
Day of Week: FridayTrail:  MST SECTION ID: Bull Gap Re-Lo                 Item # 517

  Blodgett, Lew                       1              7             8         
Bloom, Jim                        

Bodenhorst, Piet                    1              7             8
Brasington, Boyd                   1              7             8
Brooker, Barth          
Buie, AngieCallins, Nina 
Carney, JoeDektor, Jeff                
Deal, Ken                              1             7             8
Fitzgerald, Jack       
Frank, Alan                            1             7            8
Freeman, Bill

Hillyer, John            
Holladay, Curt

Greenwalt, Bruce

Jacobs, Gordon         
Lazer, Misha           
Litvinchyk, Peter       
McDonald, Howard                 2              7             9
Raber, Dan                 
Robinson, John                       1              7             8
Samuels, Sam             
Sheldon, Skip                         2              7             9

Soldati, John                

Stambaugh, Sherm                  1              7             8
Thomas, Jack                          1              3             4

Walton, Don

WORK DONE:  Finished building the Relocation of MST @ Bull Gap.

Old trail was blocked at both ends.Maintainer will blaze as weather permits.Item # 517 is complete

 Work Needed:.None  Reported by: Piet

---------------------------------------------------------------------

Monday Crew Report - 01/16/06

CMC EASTERN TRAIL REPORT
                
Check:  AT X MTS _ Other _
SECTION ID: Sam' Gap to .5 mi North of Street Gap.
                                 
                           Hours
                   Travel   Work   Total
Brooker, Barth       1        4      5
Poe, Bob              1        4      5
Walton, Don          1        4      5

Most of trail in good shape.  No trees down.
Trail collapsing downhill about 10 minutes
North of Sam's Gap.  Needs tread work to widen.

Barth
Brooker barthb@bellsouth.net 828-299-0298

 

----------------------------------------------------

Friday, January 20

This Friday the Friday Pisgah crew of 14 worked 6.5 hours clearing Green River Gameland trails.
We found heavy damage due to the ice storms and winds which followed.
We split the crew into two crews with two saws each,
and cleared many blow downs along Bishop Branch and Pullham Creek, but did not finish our work.
We will return soon to complete this work. Bill

------------------------------------------

CMC EASTERN TRAIL REPORT
Date: 1\20\06
Day of Week: FridayTrail:   MSTSECTION ID: Big Ridge- Hard Times Rd.               Item # 537-576-586-587-594-607-610                                                                                        Travel                 Work           Total

Blodgett, Lew                          1                          7                8
Bloom, Jim   

Bodenhorst, Piet                      1                          7                8
Brasington, Boyd      
Brooker, Barth                         1                          6                7
Dektor, Jeff                              1                          7                8
Deal, Ken                
Fitzgerald, Jack                        2                          7               9
Frank, Alan                              2                          7               9
Freeman, Bill                           1                          7                8

Hillyer, John            
Holladay, Curt 

Greenwalt, Bruce                     1                         6                 7 

Lazer, Misha           
Litvinchyk, Peter       
McDonald, Howard                  2                        7                9
Newton, Bill
Raber, Dan                 
Robinson, John                         1                         7               8     
Samuels, Sam             
Sheldon, Skip                           2                         7               9

Soldati, John    

Stambaugh, Sherm               
Thomas, Jack                            1                        7                8 

Walton, Don                             1                        6                7 

WORK DONE: Cleared trail of about 100 trees from last Saturday wind Storm.Cleaned some waterbars and wet crossings. Please close above items Work Needed:.Bent Creek to Chestnut Cove. Northern part narrow, cupping. Four water crossings need rock work. Temporary Rootball bypass need improving

-----------------------------------------------------------------------

 Monday Crew Report - 01/25/06

Due to various reasons, the Monday crew was out on Wednesday.

CMC EASTERN TRAIL REPORT
                
Check:  AT _ MTS X Other _
SECTION ID: Rt. 191 to Hard Times Rd.
            Rt 74A to BRP 386
                                 
                           Hours
                   Travel   Work   Total
Brooker, Barth       1        3      4
Gearrick, Warren     1        5      6
Walton, Don          1        5      6

We finished up the clearing started Friday on the MST.  There were about 10 trees removed
and 6 low hanging rhodos plus lopping along the trail

Also Don & Warren completed item 613 (trees between Rt 74A and BRP 386).

Barth

---------------------------------------------

The two CMC Friday crews combined to put 28 workers out today, (Friday January 27).

We worked the Florence tract in Gerton in support of the NC Nature Conservancy with Bonnie Millar.
The picture below is a group shot of our combined crews.

---------------------------------------------------------------------------

CMC EASTERN TRAIL REPORT
Date: 1\27\06
Day of Week: Friday Trail:  SECTION ID: Florence Tract                                                      Item #             

                                  Travel                 Work           Total

Blodgett, Lew                          1                          7                 8
Bloom, Jim                

Bodenhorst, Piet                      1                          7                 8
Brasington, Boyd      
Brooker, Barth          
Dektor, Jeff                             1                         7                 8
Deal, Ken                
Fitzgerald, Jack                      1                         7                  8
Frank, Alan                             1                         7                 8
Freeman, Bill                          1                         7                 8

Hillyer, John            
Holladay, Curt     

Greenwalt, Bruce      

Lazer, Misha           
Litvinchyk, Peter       
McDonald, Howard                 1                   7                8
Newton, Bill
Raber, Dan                 
Robinson, John                        1                  7                 8        
Samuels, Sam             
Sheldon, Skip                          1                  7                 8

Soldati, John          

Stambaugh, Sherm               
Thomas, Jack                          1                  7                  8  

Walton, Don                            1                  7                 8

 WORK DONE:  Widened Blue trail at the entrance. Build a set of stairs. Marked several re-lo. Cut blow downs.

 Work Needed:.Inprove balance of trail, cut trees on Red trail, build re-los on Blue trail. Fix 6 bridges.( Blue and white trail) 

Reported by:  Piet

 

CMC EASTERN TRAIL REPORT
Date: 2\3\06
Day of Week: FridayTrail:  Green River Cove SECTION ID: Green River Game Lands                                                     Item #                                               Travel                 Work           Total

Blodgett, Lew                         1                         7                  8
Bloom, Jim                             1                         7                  8

Bodenhorst, Piet                     1                         7                  8    
Brasington, Boyd                    1                         7                  8
Brooker, Barth          
Dektor, Jeff                             1                         7                  8
Deal, Ken                                1                         7                 8
Fitzgerald, Jack                       1                         7                 8
Frank, Alan              
Freeman, Bill

Hillyer, John            
Holladay, Curt

Greenwalt, Bruce                     1                         7                8

Lazer, Misha           
Litvinchyk, Peter       
McDonald, Howard                  1                         7                8
Newton, Bill
Raber, Dan                                1                         7                8
Robinson, John                          1                         7                8
Samuels, Sam             
Sheldon, Skip                             1                          7                8

Soldati, John         

Stambaugh, Sherm               
Thomas, Jack                             1                         7                 8   

Walton, Don

 WORK DONE: Cleared Green River Cove trail- cut 19 trees, several tree top blockages, build 6 re-lo around root balls, drained 4 wet areas. 
  Work Needed:.None 

Reported by:  Piet